A complete electrical and communications package for a new food-production facility — mains through to fit-off, delivered to the construction program.

Mobile Automation delivered the complete electrical and communications services for a food producer's Melbourne facility, working to the builder's phase 2 construction program.

Tray and mains routes set out first

The backbone went in before anything could follow it.

  • Suspended brackets cut from threaded rod and strut, hung from a roof six metres up
  • Brackets levelled and squared before any tray was bolted down
  • Fixings into sandwich-panel roofing silicone-sealed
  • Waterfall and tee pieces so runs turn and branch without disturbing finished sections
  • An 18 m run of 600 mm tray carried into the freezer
  • Runs laser-measured before mains were pulled to each distribution board

Temporary supplies out, permanent supplies in

The work was sequenced to the builder's program.

  • Temporary power and lighting feeding the site sheds and office workstations
  • Temporary services removed area by area as each ceiling was closed
  • Permanent luminaires, sensors and emergency fittings installed behind them
  • Mains prepped and tied at DB2 and DB4 ahead of a weekend shutdown
  • Main board and generator isolated and locked out and a redundant board removed
  • New control panel and generator supply fitted off, then the site re-energised and tested

Cold rooms, ovens and door systems

Each production area set its own electrical requirement.

  • Two floor-heating cables laid to the room layout diagram using heat-resistant tape
  • Corrugated conduit protecting only the cold section through the floor
  • A spare temperature probe run beside the working one
  • Door heaters on dedicated isolators and transformers
  • Ovens fed by 16 mm circuits to 80 A isolators set clear of the range hood
  • Three robotic sliding doors supplied with power and push-button control
  • Heat-trace, roller doors, cool room and high-care lighting as areas were released

The results

  • Cat 6 to the office and time clocks, terminated into patch panels and labelled by category and number
  • Plans recorded against the runs as installed
  • Coordinated sub-mains serving the air-conditioning, fire, security and hydraulic switchboards
  • Exit and emergency fittings labelled against the emergency plans and tested
  • RCDs proven and board labels checked circuit by circuit against the outlets they feed
  • Equipment stocktake compiled for the safety certificate