A complete factory, relocated and running in under a month

Taurean Door Systems (part of Stramit) moved their entire manufacturing operation to a new 7,000m² factory — we moved everything that plugged in, ran on power or talked to a PLC.

Taurean Door Systems, part of steel building products group Stramit, consolidated its Victorian operations into a new 7,000m² factory at Knoxfield. Every production machine had to come out of Bayswater North and be running at Knoxfield, with the gap between the last panel made and the first panel made as short as possible.

Machinery installed and aligned during a factory relocation

Ten months of planning, then a four-week window

Planning ran alongside Stramit's project team long before anything was unbolted.

  • Move sequence for every production machine agreed with Stramit's project team
  • Decommissioning at Bayswater North began on 21 December
  • Plant fully operational at Knoxfield by 18 January
  • Whole relocation held inside a single four-week production window

Backed up before it was disconnected

Machine data was captured and proven before a single machine came off its footings.

  • Every production machine decommissioned by Mobile Automation
  • All PLC data backed up and verified first
  • Each machine recommissioned at Knoxfield after the move
  • Every machine verified against its own pre-move backup, so there were no surprises at start-up

Everything the building needed, not just the machines

The new factory needed its services installed as well as its plant reinstated.

  • All site power run through the new Knoxfield building
  • Single- and double-phase outputs provided to suit the plant
  • Fibre optics run across the site and the administration areas powered
  • Everything that plugged in, ran on power or talked to a PLC moved by one contractor

The results

  • Victorian operations consolidated into one 7,000m² factory at Knoxfield
  • Panel production restarted inside the planned four-week window
  • Gap between the last panel made at Bayswater North and the first at Knoxfield kept short
  • No start-up surprises, every machine checked against its pre-move backup
  • Stramit's project manager: “Can't speak highly enough… one really happy customer.”